[Construction Case] Nursing Facility South Building: Underfloor Void (Cavity) Filling Work
Due to weak ground, ground subsidence! Only the ground is sinking, creating gaps under various floors inside the building.
We would like to introduce a case of "subfloor void filling work" conducted at a nursing care facility located in Shizuoka Prefecture. Due to weak ground, ground subsidence had occurred, causing the ground to sink while voids were observed under various areas of the floor within the building. We performed filling work using polyurethane resin to fill the voids beneath the floor slab, successfully eliminating the voids. 【Case Overview】 ■ Construction Area: Approximately 250m2 ■ Location: Nursing care facility in Shizuoka Prefecture ■ Construction Period: 3 days *For detailed information about the case, please refer to the related links. For more details, please check the PDF materials or feel free to contact us.
- Company:アップコン 沈下修正の専門家【全国対応】【本社】神奈川県川崎市【事務所】札幌・仙台・名古屋・大阪・福岡
- Price:Other